| 2026–Awarded | Sirung Production Platform (EPC) — Piping Subcontracting Works | Brooke Holding | PTT Exploration & Production |
| 2026–Ongoing | Sirung Production Platform (EPC) — Structural Fabrication Subcontracting Works | Brooke Holding | PTT Exploration & Production |
| 2026–Ongoing | Bayan Redevelopment Phase 3 (ePCC) — Manpower, Equipment, Tools & Consumables for Hook-Up & Commissioning | Dialog E & C | PETRONAS Carigali |
| 2026 | Bayan Redevelopment Phase 3 (ePCC) — Onshore Fabrication & Non-Destructive Testing | Dialog E & C | PETRONAS Carigali |
| 2025–2026 | Baram Junior Cluster — Fabrication of Offshore Installation Aids & Supply of Manpower, Equipment, Tools and Consumables | Dialog E & C | Dialog E & C |
| 2025–2026 | Baram Junior Cluster — Minor Fabrication, Installation, Mechanical Integration & Pre-Commissioning | Dialog E & C | Dialog E & C |
| 2025–2026 | Baram Junior Cluster — Salbiah Wellhead Platform (SLDP-A) ePCC, Structural Fabrication Works | Brooke Holding | Dialog E & C |
| 2025 | Baram Junior Cluster — Pre-Fabrication, Structural of Salbiah Wellhead Platform | Dialog E & C | Dialog E & C |
| 2025 | Baram Junior Cluster — Onshore Fabrication, Piping SLDP-A | Dialog E & C | Dialog E & C |
| 2025 | Baram Junior Cluster — Manpower, Equipment, Tools & Consumables for BNCPP-B Modification and Host Tie-In | Dialog E & C | PETRONAS Carigali |
| 2025 | Baram Junior Cluster — Onshore Fabrication (Structural) | Brooke Holding | PETRONAS Carigali |
| 2025 | Baram Junior Cluster — Onshore Fabrication for Brownfield Piping & Salbiah WHP Hook-Up & Commissioning | Dialog E & C | PETRONAS Carigali |
| 2023–2025 | F6 VLAP Compression Project — Structural Subcontracting Works | Brooke Holding | Shell |
| 2023–2025 | F6 VLAP Compression Project — Piping Subcontracting Works | Brooke Holding | Shell |
| 2023 | Bayan Wells — Ridhwan String Surface Modification for Gas Lift, HUC Works (Scope 3) | Dialog E & C | PETRONAS Carigali |
| 2023–2024 | South Furious 30 Water Flood Phase 2 (EPCI) — Piping Fabrication | Brooke Dockyard | Sea Hibiscus |
| 2023–2024 | South Furious 30 Water Flood Phase 2 (EPCI) — Structural Fabrication | Brooke Dockyard | Sea Hibiscus |
| 2022 | Longi Kuching — RODI Water System Installation & Commissioning | Nanjing Auto Purifying Engineering | Longi |
| 2022 | Bayan Gas Phase 2 — Manpower, Equipment, Tools & Consumables for Platform Modification and HUC | Dialog E & C | PETRONAS Carigali |
| 2022 | TIMI Development — Piping Fabrication (EPC of Fixed Offshore Structure Works) | Brooke Dockyard | Sarawak Shell |
| 2021–2022 | Bayan Gas Phase 2 — Supply, Fabrication, Assembly, Seafastening & Load Out (Structural & Piping) | Labuan Shipyard & Engineering | Dialog E & C |
| 2021–2022 | TIMI Development — Structural Fabrication (EPC of Fixed Offshore Structure Works) | Brooke Dockyard | Sarawak Shell |
| 2019–2020 | Submarine Pipeline — Butterworth to Pulau Pinang | Wira Syukur Wibawa | Perbadanan Bekalan Air Pulau Pinang |
| 2019–2020 | Bayan Redevelopment PH 2B/2C — Offshore Installation & HUC | Dialog E & C | PETRONAS Carigali |
| 2019–2020 | Bayan Redevelopment PH 2B/2C — Piping Fabrication | Dialog E & C | PETRONAS Carigali |
| 2019–2020 | Bayan Redevelopment PH 2B/2C — Structural Fabrication | Dialog E & C | PETRONAS Carigali |
| 2019 | Bokor Phase 3 Redevelopment Wellhead Platform — Piping Fabrication | Brooke Dockyard | PETRONAS Carigali |
| 2018–2019 | Bokor Phase 3 Redevelopment Wellhead Platform (FEED EPCIC) — Structural Fabrication | Brooke Dockyard | PETRONAS Carigali |
| 2018–2019 | EPCC for Anjung Facilities — Piping Fabrication | Brooke Dockyard | PETRONAS Carigali |
| 2018 | EPCC for Anjung Facilities — Mechanical Fabrication | Brooke Dockyard | PETRONAS Carigali |
| 2017–2018 | EPCC for Anjung Facilities — Structural Fabrication | Brooke Dockyard | PETRONAS Carigali |
| 2017 | E6DP-A Topside & Jacket — Piping Fabrication | Brooke Dockyard | Sarawak Shell |
| 2016–2017 | E6DP-A Topside & Jacket — Structural Fabrication | Brooke Dockyard | Sarawak Shell |
| 2015–2016 | SA-SA Topside Facilities — Piping Fabrication | Brooke Dockyard | Murphy Sarawak Oil |
| 2015–2016 | SA-SA Topside Facilities — Structural Fabrication | Brooke Dockyard | Murphy Sarawak Oil |
| 2014–2015 | Package 5 Submarine Pipeline — Tanjung Manis Water Pipeline | PPES Works | PPES Works |
| 2014–2016 | SA-SA Topside Facilities — Mechanical Fabrication | Brooke Dockyard | Murphy Sarawak Oil |
| 2014–2015 | D35DP-A Facilities Modification & Well Tie-In for CTU Drilling | Dialog E & C | PETRONAS |
| 2014 | BYDP-B Deck Extension Work (Onshore & Offshore) | Dialog E & C | PETRONAS |
| 2014 | SA-SA Jacket — Fabrication Subcontracting | Brooke Dockyard | Murphy Sarawak Oil |
| 2014 | SA-PA & SA-AA Topside — Offshore Manpower Supply | Brooke Dockyard | Murphy Sarawak Oil |
| 2013 | SA-PA & SA-AA Topside — Piping Fabrication & Installation Subcontracting | Brooke Dockyard | Murphy Sarawak Oil |
| 2013 | SA-PA & SA-AA Topside — Structural Fabrication & Installation Subcontracting | Brooke Dockyard | Murphy Sarawak Oil |