Facilities

Dual-location workshop footprint across East Malaysia

Our Labuan hub and Kuching workshop enable rapid mobilisation, reduced logistics lead time, and efficient execution for offshore projects across Sabah and Sarawak.

LOCATIONS
LABUAN · KUCHING
WORKSHOP AREA
1.76 ACRES
OUTPUT
2,000–3,500 MT / YR

Ironfield Engineering Sdn. Bhd. operates from a strategically located fabrication workshop designed to support high-quality, medium-scale fabrication activities. The layout of our facility optimises material flow, safety, and execution efficiency.

// Labuan Headquarters / Hub

/ LOCATION · 01

HQ

Labuan Headquarters / Hub

Lot CL 205378249, Sg. Buton, Jalan Bebuloh, 87008 Wilayah Persekutuan Labuan.

// Kuching Workshop

/ LOCATION · 02

WORKSHOP

Kuching Workshop

Lot 1284, Lorong Demak Indah 3, Demak Laut Industrial Park, Phase IIA, 93050 Kuching, Sarawak, Malaysia

Approximate size: 1.76 acre

// Kota Kinabalu Office

/ LOCATION · 03

SABAH

Kota Kinabalu Office

Ironfield Engineering Sabah Sdn. Bhd. · Reg. No 202301044677 (158593-P)

Lot 7, Kolombong Industrial Development, Inanam, 88450 Kota Kinabalu, Sabah, Malaysia

/ CAPABILITIES

Workshop capabilities

  • 01 Covered fabrication areas with segregated zones for carbon steel, stainless steel, and special / exotic materials
  • 02 Ground-level fabrication layout suitable for structural steel and piping works
  • 03 Forklift-accessible work zones (up to 3-ton handling capacity)
  • 04 Lifting support via external mobile cranes, arranged as required for heavy components
  • 05 Dedicated on-site storage areas for raw materials, consumables, and fabricated items
  • 06 Third-party NDT coordination available for RT, UT, MPI, and DPI inspections

/ IN-HOUSE CAPACITY

Structural fabrication
100–130 MT per month
Piping fabrication
6,000–9,000 DI per month
Qualified welders
20–40, scalable based on project requirements

/ INTEGRATED DELIVERY

  • Historical annual fabrication throughput (last 3 years): ~2,000–3,500 MT per year
  • Achieved through a combination of IFESB's in-house workshop and established partner yards, enabling efficient execution of large EPCIC and multi-package projects.

Actual output is dependent on material type, weld complexity, inspection requirements, and project execution strategy.

/ STRATEGIC ADVANTAGE

Dual presence in Labuan and Kuching enables rapid mobilisation, reduced logistics lead time, and efficient execution for offshore projects across Sabah and Sarawak.

/ MACHINERY & TOOLS

Machinery & tools

Our fabrication and installation works are supported by a wide range of modern equipment, including:

  • Welding Machines (SMAW, GTAW, GMAW, SAW processes)
  • Oxy-Acetylene and Plasma Cutting Machines
  • Hydraulic Pipe Benders and Bevelling Tools
  • Grinding and Finishing Tools
  • Air Compressors and Pneumatic Tool Sets
  • Portable Magnetic Drills
  • Pipe Threading Machines
  • Inspection tools (Vernier calipers, micrometers, welding gauges, etc.)

All equipment is maintained in accordance with a scheduled preventive maintenance plan to ensure optimal performance and compliance with project specifications.

/ MATERIAL HANDLING

Material handling & storage

We prioritize safe and efficient material movement and storage:

  • Designated raw material storage zones with weather-resistant coverage
  • Pipe racks, steel plate stands, and lifting slings for organized handling
  • Forklifts and lifting frames for internal logistics
  • Controlled environment for storage of welding consumables and electrodes
  • Secure areas for finished product staging and load-out preparation